Free Water Supply Well Constructor License Examination Practice Questions
100 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the Water Supply Well Constructor License Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1An Oregon business plans to advertise and contract with landowners to construct water supply wells. Which licensing rule applies before the business offers those services?
- A. Only the drilling-machine operator needs a license after work begins
- B. The person offering or entering the construction contracts must hold a water well constructor's license in good standing
- C. A license is required only when the proposed well will serve more than three households
- D. A landowner permit held by each customer substitutes for the contractor's license
Answer: B
Explanation: ORS 537.747(1) says, "No person shall advertise services to construct, alter, abandon or convert wells, offer to enter or enter into a contract" without a water well constructor's license in good standing. The planned advertising and contracting therefore require the license before services are offered.
2OWRD orally approves a bonded constructor's special-standard request. When must the constructor submit the written request?
- A. Within 24 hours
- B. Within five calendar days
- C. Before the next license renewal
- D. Within three working days of oral approval
3A driller measures the water depth after a well has been idle long enough to recover. What hydraulic term describes this measurement?
- A. Pumping water level
- B. Specific capacity
- C. Drawdown
- D. Static water level
Answer: D
Explanation: The OWRD study packet defines static water level as "The depth of the water level in a well when it is not being pumped." The recovered, nonpumping measurement is therefore the static water level.
Reference: Water Well and Monitoring Well Study Guide and Application — p. 12, Understanding Well Hydraulics
4A crane used at a drilling site may operate within 20 feet of an overhead line rated at or below 350 kV. What is the first information the employer should obtain from the utility?
- A. The line's height above grade
- B. The line's voltage
- C. The horizontal distance to the nearest pole
- D. Whether the line is presently energized
5The actual annular-seal placement date will differ from the date on a submitted start card. How far in advance must OWRD be notified of the change?
- A. At least four hours
- B. At least 30 days
- C. At least 72 hours
- D. At least 10 days
6On Oregon's public-land survey framework, in which general direction does the Willamette Base Line extend?
- A. North and south
- B. Northeast and southwest
- C. East and west
- D. Only west from the meridian
7A sample formed by cooling from a molten mass. To which main rock class does it belong?
- A. Igneous
- B. Metamorphic
- C. Sedimentary
- D. Unconsolidated sediment
8A helper who does not hold an Oregon water well constructor's license is assigned to operate drilling machinery. Under the statutory exception, what must be true?
- A. The helper must hold a pump-installer license
- B. The landowner must remain at the site
- C. The helper must be supervised by a person who possesses the water well constructor's license
- D. The helper may operate only after filing a separate contractor bond
9A constructor determines that a proposed site lies within an Oregon Critical Ground Water or Withdrawal Area. Whom must the constructor contact for more information before proceeding?
- A. The OWRD Salem licensing office
- B. The watermaster for the county
- C. The Oregon DEQ regional office
- D. The county planning department
10During a constant-rate test, the depth to water is recorded along with elapsed pumping time. What is that depth called?
- A. Pumping water level
- B. Static water level
- C. Aquifer thickness
- D. Entrance velocity
Answer: A
Explanation: The study packet defines pumping water level as "The depth of water level in a well when it is being pumped" and notes that it is recorded with elapsed time. That is the measurement described.
Reference: Water Well and Monitoring Well Study Guide and Application — p. 12, Understanding Well Hydraulics
Topics in this practice bank
These topics describe the available practice for Water Supply Well Constructor License Examination. Review the examination outline and its sources for scope and allocation details.
- Oregon Revised Statutes 537.505 through 537.795 and 537.992
- Oregon Administrative Rules Chapter 690, Divisions 200 through 230
- Hydrogeology, the occurrence and movement of groundwater, and water supply well design, construction and development
- Types, uses and maintenance of drilling tools and equipment, drilling problems and corrective procedures, repair and sealing of water wells, and safety rules and practices
- Correctly completing the start card and well log
- Plotting the location of a well using township, range, section, and quarter-quarter
- Identification of igneous, metamorphic and sedimentary rocks, and other materials such as sand and gravel
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view Water Supply Well Constructor License Examination details.