Free General Examination Practice Questions
59 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the General Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A Tennessee drilling business wants its company, rather than a named worker, to hold the water well driller credential. How are these licenses issued?
- A. Only to the qualifying individual
- B. To the business entity through a designated qualifier
- C. Jointly to the individual and employing business
- D. To each registered drilling rig used by the business
2The Director requests advance notice of a scheduled well reconstruction. How much notice must the Tennessee license holder give?
3A water well must be built within a Tennessee 100-year floodplain. How far above that floodplain must the top of watertight casing extend?
4Under the ordinary Tennessee rule, how far below ground surface must a water well source be?
5No deeper groundwater is available and Tennessee approves development of a source less than 19 feet deep. What minimum casing depth is required below ground?
6For Tennessee’s approved shallow-source exception, how far downward must the surface seal extend?
- A. Through the first 6 feet below ground
- B. Through the first 10 feet below ground
- C. Through the first 15 feet below ground
- D. Through the first 20 feet below ground
7Before completing a Tennessee water-supply well, which material must the driller remove during development?
- A. Mud and drill cuttings
- B. Gravel-pack material
- C. Cement-grout seal material
- D. Bentonite annular-seal material
8At which point in a new Tennessee water well project is disinfection required?
- A. After construction is completed
- B. When the Notice of Intent is accepted
- C. When casing is delivered to the site
- D. Before the drilling rig is positioned
9A Tennessee driller replaces damaged material while repairing a water well. What standard applies to the replacement material?
- A. It must meet new-installation requirements
- B. It must meet well-abandonment requirements
- C. It must meet rig-decal requirements
- D. It must meet renewal-application requirements
10A newly drilled Tennessee water well will not be used, and no casing was installed. Within how many days after the rig leaves must it be closed?
Topics in this practice bank
These topics describe the available practice for General Examination. Review the examination outline and its sources for scope and allocation details.
Licensure, Scope, Supervision, and Enforcement
- License scope, supervision, notifications, and enforcement
Notice, Reporting, and Records
- Notices of intent, completion reports, and retained records
Well Siting and Contamination Separation
- Flood protection, property clearances, and contamination setbacks
Groundwater Sources and Drilling Fluids
- Aquifer protection, source depth, process water, and drilling fluids
Casing and Well Screens
- Casing selection, installation, dimensions, and screen construction
Backfilling, Grouting, and Gravel Packs
- Approved sealing materials, placement methods, and filter packs
Well Development and Wellhead Completion
- Development, fracturing, caps, drainage, and pitless adapters
Water Well Disinfection
- Disinfectant dosage, application, contact time, and flushing
Repair and Well Identification
- Repair materials, liner casing, registration tags, and identification
Well Abandonment
- Closure preparation, plugging materials, seals, exceptions, and reports
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view General Examination details.