1For a Texas domestic water well, what screen is required unless the landowner waives it?
- A. A manufacturer's well screen
- B. Any hand-cut pipe selected by the crew
- C. An open hole with no screen
- D. A used oil-field screen
2When screening potential Texas well sites, which part of an aquifer corresponds to its principal recharge zone?
- A. The outcrop where the host formation is exposed at land surface
- B. The confined downdip area beneath low-permeability beds
- C. The deepest portion beyond the aquifer's saline boundary
- D. The pumping cone surrounding an individual production well
Answer: A
Explanation: TWDB explains that the aquifer's surface extent, or outcrop, is where the host formation is exposed at land surface and: “This area corresponds to the principal recharge zone for the aquifers.”
Reference: Texas Aquifers | Texas Water Development Board — Texas Aquifers, introductory aquifer-characteristics discussion
3What role can sulfate-reducing bacteria play in a well?
- A. They catalyze corrosion
- B. They promote mineral encrustation without metal loss
- C. They passivate the anodic screen slots against attack
- D. They sterilize the screen and surrounding filter pack
4Which coordinate pair identifies a well location on the Texas Well Report?
5What kind of helmet is required near exposed electrical conductors that could contact the head?
- A. A helmet designed to reduce electrical-shock hazard
- B. A soft cap with no rating
- C. A face shield alone
- D. Hearing protection only
6Which parties must sign Texas's manufactured-screen waiver before it is effective?
- A. The driller and the pump installer
- B. The driller and the owner or authorized person having the well drilled
- C. The owner and a county official
- D. The screen manufacturer and the owner
7Under the classification in Texas Report 89-01, which TDS concentration is fresh water?
- A. Less than 1,000 ppm
- B. 1,000 to 3,000 ppm
- C. 10,000 to 35,000 ppm
- D. Greater than 35,000 ppm
8Where did USGS observe corrosion concentrated in the studied well screens?
- A. On concrete slabs
- B. In the active saw slots
- C. Only on pump wiring
- D. Only above land surface
9Coordinates are needed for a Texas Plugging Report. Which location method does the form prescribe?
- A. Estimate from memory
- B. Use only the owner's mailing address
- C. Copy an unrelated well's coordinates
- D. Use GPS or an Internet mapping website
10What is OSHA's default rule for exposed live electrical parts before an employee works on or near them?
- A. Install an insulating barrier and treat that as authorization for energized work
- B. Deenergize them, unless doing so creates added hazards or is infeasible
- C. Maintain overhead-line clearance and leave the exposed parts energized
- D. Assign an observer and leave the exposed parts energized
Answer: B
Explanation: OSHA 1910.333(a)(1) says exposed live parts “shall be deenergized before the employee works on or near them” subject to the stated hazard and infeasibility exceptions.
Reference: 1910.333 - Selection and use of work practices. | Occupational Safety and Health Administration — §1910.333(a)(1)
Topics in this practice bank
These topics describe the available practice for Water Well Driller Examination. Review the examination outline and its sources for scope and allocation details.
Design, Construction, and Completion
- Well Construction
- Siting
- Plugging
Geology and Hydrology
- Water Quality
- Aquifer Properties
- Lithology
- Well Rehabilitation
Texas Law and Rule
- Apprenticeships
- Reports
- Licensee Responsibilities
- Safety
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view Water Well Driller Examination details.