Free General Well Driller Examination Practice Questions
100 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the General Well Driller Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A crew will drill a water-supply well in Delaware. Which staffing arrangement satisfies the individual licensing rule for the drilling work?
- A. A licensed well driller is in direct on-site supervision
- B. A licensed contractor checks the site once each week
- C. A pump installer reviews the completion report afterward
- D. A property owner gives written permission before drilling
Answer: A
Explanation: Section 4.2 states, "all persons who engage in any of the following activities in the State of Delaware shall be licensed by the Department as a well driller or well driver or shall be under the direct on-site supervision of a licensed well driller or well driver." Direct on-site supervision is therefore required.
2A different licensed driller, rather than the application preparer, will construct a permitted Delaware well. What must that driller obtain before construction?
- A. A new property deed
- B. A new contractor license
- C. An authorization number
- D. A variance hearing date
3What is Delaware's ordinary minimum separation between a nonpublic water-supply well and an identifiable potential source of contamination?
4A Delaware driller proposes casing made from a material other than PVC or steel. What is required before using it?
- A. Written Department approval
- B. A county plumbing permit
- C. A laboratory strength test only
- D. A public hearing
5What is the ordinary minimum annular width for a Delaware water-supply well?
6What free chlorine residual must be maintained in potable-source water used for Delaware well construction?
7What pumping-capacity threshold requires a Delaware well to have a water-level access port and tube?
- A. Greater than 10,000 gallons per day
- B. Greater than 25,000 gallons per day
- C. Greater than 50,000 gallons per day
- D. Greater than 100,000 gallons per day
8Which Delaware wells are generally subject to the well-disinfection requirement?
- A. Only newly constructed public wells
- B. All newly constructed or repaired wells, subject to listed exceptions
- C. Only domestic wells with submersible pumps
- D. Only wells deeper than 40 feet
9Absent the emergency exception, when is a Delaware well completion report and formation log due?
10What must happen if a Delaware well's annular space cannot be grouted in accordance with the regulation?
- A. Seal the well under the prescribed sealing procedure
- B. Complete the well and disclose the grout deficiency on the report
- C. Fill the remaining annulus with native formation cuttings
- D. Place the well in service after a satisfactory bacteria test
Answer: A
Explanation: Section 5.8.13.3 states, "If the annular space cannot be grouted in accordance with these Regulations, the well shall be sealed pursuant to Section 10." The reporting, backfilling, and testing alternatives do not replace the required sealing response.
Topics in this practice bank
These topics describe the available practice for General Well Driller Examination. Review the examination outline and its sources for scope and allocation details.
Licensure Scope and Licensee Duties
- License scope, qualifications, employment, and supervision
- Licensee identification, responsibilities, renewal, and conduct
Well Permitting and Authorization
- Permit prerequisites, preparation, and application requirements
- Permit duration, emergency authorization, relocation, transfer, and use
Well Siting and Contamination Protection
- Separation distances and location restrictions
- Contamination review, construction safeguards, and site access
Casing, Screens, and Gravel Packs
- Casing materials, dimensions, joints, and placement
- Screen selection, aquifer protection, and gravel packs
Annular Seals and Grouting
- Annular dimensions, placement, timing, and inspection
- Grout mixtures, water conditioning, cure, and performance
Construction Water, Fluids, Development, and Wellheads
- Construction water, drilling fluids, and lost circulation
- Well development, pitless equipment, caps, and head completion
Pumping Controls and Special Water-Supply Wells
- Access ports, meters, backflow control, pumps, and vents
- Flood-zone, public, industrial, agricultural, and construction wells
Well Disinfection and Water-Quality Release
- When disinfection and bacteriological testing are required
- Disinfectant dosage, contact, residual, flushing, and sampling
Completion Records and Identification Tags
- Completion reports, formation logs, signatures, and attachments
- Tag timing, placement, fastening, and return
Repair, Sealing, Alternative Compliance, and Enforcement
- Repair limits, sealing triggers, materials, procedures, and reports
- Alternative methods, variances, discipline, suspension, and appeals
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view General Well Driller Examination details.