OpenExamsFREE PRACTICE — ANY EXAM

Free Louisiana Lead Project Supervisor State Lead Certification Examination Practice Questions

99 free questions · Answer explanations · No signup required

View examination details, outline and sources

Loading selected examination banks…

Sample Practice Questions

Try these 10 sample questions from the Louisiana Lead Project Supervisor State Lead Certification Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.

  1. 1A homeowner plans lead-hazard reduction work in a Louisiana residence that the homeowner owns and occupies. No other person occupies it, and no resident child has an elevated blood lead level. How does the state lead-activity chapter apply?

    1. A. The work is outside the state lead-activity requirements
    2. B. Only the notification requirements apply
    3. C. Only the accreditation requirements apply
    4. D. All state lead-activity requirements apply

    Answer: A

    Explanation: LAC 33:III.2801.B excludes this narrow owner-occupant situation: "except persons who perform these activities within residential dwellings that they own, unless the residential dwelling is occupied by a person or persons other than the owner or the owner's immediate family while these activities are being performed, or a child residing in the building has been identified as having an elevated blood lead level." The stated facts meet the exclusion.

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2801.B

  2. 2A pre-1978 center is visited by the same five-year-old on two days each week, three hours per visit, for 60 hours each year. How is the center classified under Louisiana's rule?

    1. A. A child-occupied facility
    2. B. Target housing only
    3. C. An industrial facility
    4. D. A zero-bedroom dwelling

    Answer: A

    Explanation: The LAC 33:III.2803 definition applies when the same child visits "on at least two different days within any week, provided that each day's visit lasts at least three hours, with the combined weekly visit lasting at least six hours, and that the combined annual visits last at least 60 hours." These facts satisfy every threshold.

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2803, definition of Child-Occupied Facility, paragraph a

  3. 3A Louisiana contractor proposes assigning unaccredited labor to conduct part of an abatement while an accredited supervisor watches. Does that satisfy the rule?

    1. A. No, abatement may be conducted only by persons accredited by the department
    2. B. Yes, whenever a supervisor remains in the building
    3. C. Yes, if the work lasts less than one day
    4. D. Yes, if the contractor has filed an LPN

    Answer: A

    Explanation: LAC 33:III.2811.E.1 states: "An abatement shall be conducted only by persons accredited by the department according to the procedures in this Section." Supervisor presence does not replace each person's required accreditation.

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2811.E.1

  4. 4A crew proposes open-flame burning to remove lead-based paint during a Louisiana abatement. What must the supervisor decide?

    1. A. Reject the method because open-flame burning or torching is prohibited
    2. B. Allow it below 1,100 degrees Fahrenheit
    3. C. Allow it with a HEPA shroud
    4. D. Allow it on exterior surfaces only

    Answer: A

    Explanation: LAC 33:III.2811.E.6.a states: "open-flame burning or torching of lead-based paint is prohibited." The conditions governing heat guns and HEPA-shrouded machines do not create an exception for open flames.

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2811.E.6.a

  5. 5Who may perform the post-abatement clearance procedures specified in Louisiana's abatement rule?

    1. A. Only an accredited inspector or accredited risk assessor
    2. B. Any accredited lead worker
    3. C. The accredited supervisor who conducted the abatement
    4. D. Any employee of the licensed contractor

    Answer: A

    Explanation: LAC 33:III.2811.E.9 provides: "The following post-abatement clearance procedures shall be performed only by an accredited inspector or an accredited risk assessor."

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2811.E.9

  6. 6A Louisiana public entity uses its own employees for a covered lead abatement. Which status does Chapter 28 require?

    1. A. Both the entity and its employees are exempt
    2. B. The entity is exempt from licensure, but its employees need the appropriate accreditation
    3. C. The entity needs a contractor license, but its employees need no accreditation
    4. D. The entity needs only an annual project permit

    Answer: B

    Explanation: LAC 33:III.2801.C states: "Public entities are exempt from the requirements for licensure; however, employees of public entities must be accredited in the appropriate disciplines." The entity's exemption therefore does not extend to its workers' accreditation.

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2801.C

  7. 7For the regular-visit test in Louisiana's child-occupied facility definition, what is the oldest included child age?

    1. A. Five years old
    2. B. Six years old
    3. C. Seven years old
    4. D. Eight years old

    Answer: B

    Explanation: LAC 33:III.2803 applies the regular-visit criterion to the same child who is "6 years of age or younger."

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2803, definition of Child-Occupied Facility, paragraph a

  8. 8During the work period described in a Louisiana lead project notification, how often must the accredited lead project supervisor be present?

    1. A. Only during setup
    2. B. At all times for the abatement project
    3. C. Only during final cleanup
    4. D. Only while clearance samples are collected

    Answer: B

    Explanation: LAC 33:III.2811.E.2 requires that "An accredited lead project supervisor must be present at all times for each abatement project, as described in the lead project notification."

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2811.E.2

  9. 9Under what condition may machine sanding of lead-based paint be used during a Louisiana abatement?

    1. A. When the surface is exterior
    2. B. When used with attached HEPA vacuum-shrouded exhaust control
    3. C. When the room is unoccupied
    4. D. When the project lasts less than one day

    Answer: B

    Explanation: LAC 33:III.2811.E.6.b states that "machine sanding or grinding or dry abrasive blasting or sandblasting of lead-based paint is prohibited unless used with attached High Efficiency Particulate Air (HEPA) vacuum-shrouded exhaust control."

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2811.E.6.b

  10. 10What is the first clearance-stage examination following a Louisiana abatement?

    1. A. Composite soil sampling
    2. B. A visual inspection for deteriorated paint and visible dust, debris, or residue
    3. C. A review of the candidate's accreditation file
    4. D. A contractor license audit

    Answer: B

    Explanation: LAC 33:III.2811.E.9.a requires that "following an abatement, a visual inspection shall be performed to determine if deteriorated painted surfaces and/or visible amounts of dust, debris, or residue are still present."

    Reference: Lac Title 33 Part III (2026) — LAC 33:III.2811.E.9.a

Topics in this practice bank

These topics describe the available practice for Louisiana Lead Project Supervisor State Lead Certification Examination. Review the examination outline and its sources for scope and allocation details.

  • Louisiana accreditation, authority, and programme scope
    • Programme applicability and exemptions
    • Lead project supervisor authority and discipline boundaries
    • Initial accreditation and examination prerequisites
    • Accreditation sanctions, enforcement, and reciprocity
  • Louisiana regulated facilities, hazards, and defined terms
    • Target housing and child-occupied facilities
    • Lead-based paint and hazard thresholds
    • Abatement, interim controls, containment, and coverings
    • Sampling, laboratory, and clearance terminology
  • Louisiana project administration and protection planning
    • Supervisor presence and project accountability
    • Regular project notification and schedule controls
    • Emergency and amended project notifications
    • Occupant and worker protection plans
  • Louisiana abatement methods, soil controls, and related duties
    • Prohibited and restricted paint-removal methods
    • Exterior pre-abatement soil controls
    • Soil abatement methods
    • Waste, building-code, and interim-control duties
  • Louisiana clearance, reporting, records, and consequences
    • Clearance personnel and sequencing
    • Clearance sampling by abatement scope
    • Random sampling, failed clearance, and reoccupancy
    • Abatement reports, records, and enforcement consequences

How to use these free practice questions

Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.

These are independent study questions, not actual examination items. For examination requirements and official information, view Louisiana Lead Project Supervisor State Lead Certification Examination details.