Free NJ Regulations for Journeyman (Class B) Practice Questions
118 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the NJ Regulations for Journeyman (Class B) practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A completed private well is no longer in use. Under New Jersey's subsurface waters law, who remains responsible for having the well sealed?
- A. The well owner responsible for the unused well
- B. The drilling contractor who completed the well
- C. The pump installer who last serviced the well
- D. The State board that licenses well drillers
Answer: A
Explanation: N.J.S.A. 58:4A-4.1 states, "The owner of any well shall be responsible for having the well sealed" if it is not in use. This is an existing unused well; the contractor's separate primary responsibility concerns a borehole abandoned during construction.
Reference: Subsurface and Percolating Waters Act — PDF page 1, owner responsibility paragraph
2A New Jersey Journeyman (Class B) driller is offered a contract to construct a cased monitoring well in the State's monitoring-well category. What does the Class B license permit?
- A. The driller may not perform that monitoring-well work under the Class B license
- B. The driller may perform it after obtaining a site-wide permit
- C. The driller may perform it if no permanent pump is installed
- D. The driller may perform it when the borehole is shallow
Answer: A
Explanation: N.J.A.C. 7:9D-1.7(a)3 states that a Class B driller may work on wells of any category "except public community supply wells and Category 3 wells." The proposed monitoring well is Category 3, so it is outside this license's authority.
3A driller is assessing buried infrastructure near a borehole. Which pair consists entirely of 'underground facilities' under the New Jersey Underground Facility Protection Act?
- A. A forced-sewage line and an electric service line
- B. A gravity sewer and an electric service line
- C. A storm drain and a forced-sewage line
- D. A gravity sewer and a buried storm drain
Answer: A
Explanation: N.J.S.A. 48:2-75 includes conveyance of "forced sewage" and "electricity" in its underground-facility definition, while expressly excluding "storm drains or gravity sewers." Only the pair in A contains two covered facilities.
Reference: Underground Facility Protection Act — N.J.S.A. 48:2-75, definition of underground facility
4For routine excavation associated with well work, when must the excavator notify New Jersey One Call?
- A. At least 3 but not more than 10 business days before excavation
- B. At least 1 but not more than 5 business days before excavation
- C. At least 5 but not more than 15 business days before excavation
- D. At least 10 but not more than 30 business days before excavation
5A department inspector finds an abandoned borehole creating an emergency threat to subsurface water. Which authority may direct its prompt sealing under N.J.S.A. 58:4A-4.2?
- A. The county health department may order prompt sealing
- B. The well-driller examining board may order prompt sealing
- C. The Department of Environmental Protection may order prompt sealing
- D. The Board of Public Utilities may order prompt sealing
Answer: C
Explanation: N.J.S.A. 58:4A-4.2 says the Department may, upon finding an emergency, "direct the prompt sealing" of an abandoned borehole or well. That is the New Jersey Department of Environmental Protection, rather than another public body.
Reference: Subsurface and Percolating Waters Act — N.J.S.A. 58:4A-4.2, emergency sealing sentence
6Which water-supply well is excluded from the drilling authority of a New Jersey Journeyman (Class B) Well Driller?
- A. A public non-community supply well
- B. A public community supply well
- C. A domestic well
- D. A non-potable irrigation well
7An operator receives a routine One-Call notice for a planned well-site excavation affecting its buried line. Under the Act, which markout combination applies?
- A. Within three business days; within 18 inches horizontally of the facility wall
- B. Within three business days; within two feet horizontally of the facility wall
- C. Within ten business days; within 18 inches horizontally of the facility wall
- D. Within ten business days; within two feet horizontally of the facility wall
Answer: A
Explanation: N.J.S.A. 48:2-80 requires the operator to provide facility position and number "within three business days" of the notice information and to mark "within 18 inches horizontally" of the outside wall. The two-foot figure governs excavator mechanized work near a marked line, not operator markout accuracy.
Reference: Underground Facility Protection Act — N.J.S.A. 48:2-80(a)(2)
8Which abbreviated telephone number connects an excavator to the New Jersey One Call notification system?
9A responsible party refuses a Department directive to seal an abandoned well, and the Department seals it. What amount does the statute make that party liable to pay the Department?
- A. An amount equal to the Department's sealing cost
- B. An amount equal to twice the sealing cost
- C. An amount equal to four times the sealing cost
- D. An amount equal to three times the sealing cost
Answer: D
Explanation: N.J.S.A. 58:4A-4.2a makes a party who fails to comply with a sealing directive liable for "an amount equal to three times" the cost of sealing. The stated multiplier is three, rather than the other proposed multipliers.
Reference: Subsurface and Percolating Waters Act — PDF page 1, departmental sealing cost paragraph
10A customer asks a New Jersey Journeyman (Class B) Well Driller to replace permanent well pumping equipment on a domestic well. Is that work within the license scope?
- A. Only if a Master Well Driller signs the pump record
- B. Only if the pump capacity is below 70 gpm
- C. Yes, the Class B license expressly authorizes replacing well pumping equipment
- D. No, all permanent pump work is reserved to a Pump Installer
Topics in this practice bank
These topics describe the available practice for NJ Regulations for Journeyman (Class B). Review the examination outline and its sources for scope and allocation details.
- Subsurface and Percolating Waters Act
- Well Construction and Maintenance; Sealing of Abandoned Wells
- Underground Facility Protection Act
- Underground Facilities: One-Call Damage Prevention System
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view NJ Regulations for Journeyman (Class B) details.