Sample Practice Questions
Try these 10 sample questions from the BUSINESS AND LAW practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A grading project will disturb 1.4 acres on one tract. Under North Carolina's baseline rule, when must the erosion and sedimentation control plan be filed?
- A. At least 30 days before disturbance begins
- B. At least 15 days before disturbance begins
- C. Within 30 days after disturbance begins
- D. Before final stabilization
2At what project cost does a person generally become a North Carolina general contractor under G.S. 87-1?
3Which payment-related basis is barred when a subcontractor has performed according to its contract?
- A. Unsatisfactory progress on the subcontract work
- B. Defective construction that remains uncorrected
- C. Owner payment stated as a condition precedent
- D. Documented third-party claims involving the subcontractor
4Who may claim the direct real-property lien described in G.S. 44A-8 after complying with Article 2?
- A. An owner-contracted provider of covered labor, services, materials, or rental equipment
- B. A mortgage lender holding a deed of trust
- C. A judgment creditor holding a recorded judgment
- D. A commercial broker claiming an earned commission
5Which North Carolina One Call notice cannot be used to authorize excavation?
6A contractor completes one phase of grading and leaves the slope exposed. What is the North Carolina deadline for providing temporary or permanent ground cover?
7A firm erects a North Carolina-labeled manufactured modular building. Does the $40,000 threshold determine whether it is treated as general contracting?
- A. No; erecting that modular building is independently included
- B. Yes; only projects over $40,000 are included
- C. Yes; unless the building is residential
- D. No; modular buildings are always exempt
8After receiving a periodic payment attributable to a compliant subcontractor's work, how soon must the contractor pay that subcontractor?
9To what does a statutory claim of lien on real property generally extend?
- A. All contiguous land held by the owner
- B. The improvement and qualifying lot or tract to the extent of the owner’s interest
- C. Any parcel selected by the claimant regardless of ownership
- D. The improvement and the contractor’s personal property
10If an underground facility's diameter is known, how is its tolerance zone measured from the designated center line?
- A. The full diameter plus 12 inches on each side
- B. One-half the known diameter plus 24 inches on each side
- C. Exactly 24 inches total
- D. Fifteen feet on each side
Topics in this practice bank
These topics describe the available practice for BUSINESS AND LAW. Review the examination outline and its sources for scope and allocation details.
- Erosion and Sedimentation Control
- Licensing
- Subcontractor's Pay Requirements
- Liens and Bonds
- One Call
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view BUSINESS AND LAW details.